Sunday, September 27, 2009

Ready for concrete

Wow, a lot of work has been done in the past 5 weeks on this property!! We are now ready for the concrete footings to be poured, which will happen next week. After that, the basement walls will be poured and then the house can be set! Hubby thinks the house will be on the foundation by mid-October. There is some work inside the house that will need to be done after that plus roof, siding, electrical, plumbing, painting, flooring, etc. And then, the actual move....ho boy, I guess I don't want to think that far ahead!


Here's a before and after shot.
The driveway before.

The driveway after.

2 comments:

Anonymous said...

AWESOME! Cannot believe that much is done this quickly! Looks GREAT!Love,
Mom

Anonymous said...

I am absolutely amazed at how quickly you are moving!

Looking forward to the next installment!